- Member DIN
- S2424
First off, before I begin, a big thank you to PernicousDuke for his help with this build. Could not have even started w/o his help and guidance.
Ok, criteria: I have 1 month to build this (plus 2-3 days) for my son. I have built my test piece to get the sizing right and it looks to be a bit tight. Going a bit bigger w/ the actual build:
I know.....you don't have to say a word. It looks like something a dog would sniff twice at and make his mark on........But that was the whole point. This was put together in under 2 1/2 days to test for the correct sizing from regular paper and scotch tap. Now that I have it and experience w/ what goes where, the real fun can begin. Going for a foam build and I already see where pieces can be kept together for that. WHAT???!!!??? No foamboard? No, not this time.
More later as soon as I get back to the shop.
Ok, criteria: I have 1 month to build this (plus 2-3 days) for my son. I have built my test piece to get the sizing right and it looks to be a bit tight. Going a bit bigger w/ the actual build:
I know.....you don't have to say a word. It looks like something a dog would sniff twice at and make his mark on........But that was the whole point. This was put together in under 2 1/2 days to test for the correct sizing from regular paper and scotch tap. Now that I have it and experience w/ what goes where, the real fun can begin. Going for a foam build and I already see where pieces can be kept together for that. WHAT???!!!??? No foamboard? No, not this time.
More later as soon as I get back to the shop.